Question: Q 1 . There is a proposal for a development pdlan over a 1 0 H a land baving $ % slope, comprising sandy soil.
Q There is a proposal for a development pdlan over a land baving $ slope, comprising sandy soil.
The site is within the City centre and the surface runoff drains to the public sewer.
Rules and regulations of the City dictates any development plan CAN NOT EXCEED of the overall
land area.
The plan is to construet sports centre consisting several facilities with closed area covered
with roofs and the remaining permissible area will be covered with compacted gravel to be used as
carparks, driveways and walks.
Regional Meteorology Department statistics isdicate total annual rainfall intensity of
a Calculate the existing greenfield peak surface runoff to the sewer in lts
b Calculate the possible peak discharge in lts to be drained into the sewer after completion of the
development plan. Ignore about the flow time delay within the field.
c If an idea is to benefit from the naimwater harvesting for the roofed areas, calculate the size of a tank
in to store rainwater for a storm that lasts hours.Solve Step by step for upvote!
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock