Question: Q . 1 with reference to drawings. prepare a take - off list, take off all the quantities of the relevant items including excavation, concrete

Q.1 with reference to drawings. prepare a take-off list, take off all the quantities of the relevant items including excavation, concrete works (formwork and concrete) and structural steel works (except for surface preparation and treatment).
(Student is required to make your own assumption in the format of a
query sheet" to any detail not given in the question and drawings)
Q . 1 with reference to drawings. prepare a take

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!