Question: Q 2 . ( 2 5 p ) For the design flood of a spillway with an economic life of 9 a years ( a
Qp For the design flood of a spillway with an economic life of a years a is the last digit of your student number the accepted risk can be taken as A is the last digit of your student number
a Determine the return period of its design discharge.
b If the cofferdam with years economic life of this large dam is designed with years flood, determine the risk of this cofferdam.
c Find also the probability that the design flood of the cofferdam occurs at least times in the lifetime of the spillway.