Question: Q 2 . A continuous foundation ) is to be constructed on a weak soft soil layer ( C u = 3 2 kPa, 2
Q A continuous foundation is to be constructed on a weak soft soil layer kPa, to support a load of with a FS of Figure However, due to the low load bearing capacity of the foundation soil, it has been determined to use a granular trench under the foundation. Determine the minimum width and estimate the required depth of the granular trench using an excel sheet. Hint: Use Madhav and Vitkar's bearingcapacity factors curves for and
rigure
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock