Question: Q 2 . A continuous foundation ) is to be constructed on a weak soft soil layer ( C u = 3 2 kPa, 2

Q2. A continuous foundation ) is to be constructed on a weak soft soil layer (Cu=32kPa,2=18kNm3) to support a load of 300kNm with a FS of 3(Figure 4). However, due to the low load bearing capacity of the foundation soil, it has been determined to use a granular trench (O1'=30) under the foundation. Determine the minimum width and estimate the required depth of the granular trench using an excel sheet. (Hint: Use Madhav and Vitkar's bearing-capacity factors curves for Nc(T),Nq(T) and Nq(T).
rigure
Q 2 . A continuous foundation ) is to be

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!