Question: Q 2 - A sanitary sewer system will be designed for the village of Gemikona for the year 2 0 4 0 . The projected

Q2- A sanitary sewer system will be designed for the village of Gemikona for the year 2040. The
projected layout of the system, which corresponds to the end of the lifetime of the system, is shown in
the following figure and the topographic elevations of the top surfaces of manholes are given in the
table below.
Considering the following data:
Variable Nn with N=0.016,
Groundwater infiltration is 0.3lts?ha,
Rainfall contribution is 0.5lts?ha,
Min. depth of cover is 2m.
Commercial pipes are available for every 50mm increment of pipe diameter.
The minimum full flow velocity for self-cleansing is 0.6ms
The maximum full flow velocity is 4ms
P is the percent population in the area concerned,
The percent return of municipal water use to the sewer system in each area is 80%,
The length of all sewers is 120m
The population data in the city are P2000=3000 and P2010=3800
a) Estimate the population in 2040,P2040, using geometric extrapolation.
b) Design sanitary sewer between manholes M7 and M8(Dpipe=?, Elevbottom =? for M7 and M8).
Q 2 - A sanitary sewer system will be designed

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!