Question: Q 2 b . From the discharge estimated by the Bransby Williams formula above, design an adequately sized concrete pipe culvert to pass the 2

Q 2b. From the discharge estimated by the Bransby Williams formula above, design an adequately sized
concrete pipe culvert to pass the 25 years flood. The height of the road above the invert level of the river at
the culvert location is 2.85m, the length of the culvert is 60m, natural streambed slope =0.01 and the
downstream level of the 25 years flood is 1.1m above the downstream invert. Use a square edge with
headwall with ke=0.2;k0=1.0,n for concrete =0.015;f=0.02. You may consider multiple culverts if the
diameter of pipe becomes too big to be closer to headwater.
20 marks
Q 2 b . From the discharge estimated by the

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!