Question: Q . 3 ( 5 Points ) A designer is evaluating two projects, A and B , which have the following data: Which project the

Q.3
(5 Points)
A designer is evaluating two projects, A and B, which have the following data:
Which project the designer should select? Assume 5.5% discount rate.