Question: Q 3 ) A unit hydrograph is to be developed for a 1 2 0 - m i 2 watershed. 1 0 mi , Average

Q3) A unit hydrograph is to be developed for a 120-mi2 watershed. 10 mi , Average slope is 80fmi)
a) Find the peak flow (in efs) if the Snyder's method is used.
120mt2 watershed
Ct=1.8
CP=-6
L=15mi
LC=10mi
Avg slope =80Hmi
tP=c+(ccc)3
=1.8(1510).3
=8.09
9P=640cPA1P
=640.6808.c9
=5695.9Cs
b) If the duration of this unit hydrograph is 2 hr , find the time to rise and the time base of the hydrograph.