Question: Q . 3 ) In casting experiments performed using a titanium alloy and a zircon sand mold, it took 1 5 5 s for a

Q.3) In casting experiments performed using a titanium alloy and a zircon sand mold, it took 155 s for a cubeshaped casting to solidify. The cube was 50 mm on a side. If the same alloy and mold type were used, find the total solidification time for a cylindrical casting in which the diameter =30mm and length 50 mm .
Q.4) A resistance spot welding operation is performed on two pieces of 1.5 mm thick sheet steel using 12000 A for a 0.2 sec duration.. The electrodes are 7 mm in diameter at the contacting surfaces, resistance is assumed to be 0.0001 ohm , and the resulting weld nugget is a sphere of a 6 mm in diameter. The unit melting energy for the metal U=12.0Jmm3. What portion of the heat generated was used to form the weld nugget and what portion was dissipated in to the work metal, electrodes and surrounding air.
Q . 3 ) In casting experiments performed using a

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Mechanical Engineering Questions!