Question: Q 5 . 2 ( Static ) Two - step [ 5 . 1 , 5 . 6 ] Consider the following two - step

Q5.2(Static) Two-step [5.1,5.6]
Consider the following two-step process:
Step A has a processing time of 1 minute per unit, but no setup is required. Step B has a processing time of 0.1 minute per unit, but a setup time of 9 minutes is required per batch.
(a) Suppose units are produced in batches of 5(i.e., after each set of 5 units are produced, step B must incur a setup of 9 minutes). What is the capacity of the process (in units per minute)?(Round the answer to 2 decimal places.)
(b) Suppose they operate with a batch size of 15 and with this batch size step A is the bottleneck. What would be the average inventory in step B?(Round the answer to 2 decimal places. Round other intermediate computations to one decimal place. )
(c) What is the batch size that maximizes the flow rate of this process with minimal inventory? Assume there is ample demand.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!