Question: Q. Calculate the unit cost for each product using Activity-Based Costing to allocate overheads based on the drivers for each overhead cost pool (use the

 Q. Calculate the unit cost for each product using Activity-Based Costing

Q. Calculate the unit cost for each product using Activity-Based Costing to allocate overheads based on the drivers for each overhead cost pool (use the template below) and compare the difference. (5 marks)

Overhead rate

Activity

Calculation

Rate

Handling

$3,000/25

$120

Design changes

No of set-ups

Overhead application allocation

Activity

Leisure Calculation Allocation Professional Calculation Allocation

Handling

10*120

1,200

15*120

1,800

Design changes

No. of setups

Total

Per unit

Total unit cost

Leisure

Professional

Direct materials

Direct labour

Overhead

Total cost

Difference between methods

Leisure

(unit cost)

Professional

(unit cost)

Traditional based costing

Activity based costing (ABC)

Difference

Bikes R Us manufactures two types of bikes - a Leisure bike and a Professional bike. The following represent information about each bike produced for the month of February 2022 The total overhead costs were: The following information was provided in respect of drivers for each cost pool

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!