Question: Q1. Compare and contrast between three basic types of layouts product, process and fixed-position layout. Q2. Solve the following assembly line balancing problem (Hint: read

Q1. Compare and contrast between three basic types of layouts product, process and fixed-position layout.

Q2. Solve the following assembly line balancing problem (Hint: read section 6.6 of Chapter 6):

There are 17 tasks in the assembly line. The longest task is 2.4 minutes, and the total time for all tasks is 18 minutes. The line will operate for 450 minutes per day.

a) What are the minimum and maximum cycle times?

b) What range of output is theoretically possible for the line?

c) What is the minimum number of workstations needed if the maximum output rate is to be sought?

d) What cycle time will provide an output rate of 125 units per day?

Q3. What is job design, and why is it important?

Q4. What are motion study principles? Name some reasons why methods analyses are needed.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!