Question: Q1: Value Engineering (6 marks) Value engineering is a systematic, organized approach to providing necessary functions in a project at the lowest cost. Value engineering

Q1: Value Engineering (6 marks) Value engineering
Q1: Value Engineering (6 marks) Value engineering is a systematic, organized approach to providing necessary functions in a project at the lowest cost. Value engineering promotes the substitution of materials and methods with less expensive alternatives, without sacrificing functionality. 1. Discuss three specific tools are used in Value Engineering to help a project move forward? 2. During what stage of the project does Value Engineering come into play? 3. The Challenge PALTEL Company was challenged with producing a version of their current cabinet, shown here. One issue there were no elevators in the buildings they wanted to service. The cabinets would need to be light enough for two men to carry - a maximum of 200 Kgs. The product had to have all the same features and the ability to withstand all the same weight/mechanical load as the current version (function), but it had to be much lighter than the existing version. Selection and apply one of the Value Engineering tools to solve out the challenges of PALTEL without scarifying strength of the cabinet. Justify your selection

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!