Question: Q1.Classify the correct order of FOUR (4) steps in Managing Marketing. A. Planning, Analysis, Implementation and Control B. Analysis, Planning, Implementation and Control C. Control,
Q1.Classify the correct order of FOUR (4) steps in Managing Marketing.
A.
Planning, Analysis, Implementation and Control
B.
Analysis, Planning, Implementation and Control
C.
Control, Implementation, Planning and Analysis
D.
Planning, Implementation, Analysis and Control
Q2.Figure Q40 below shows the product cycle flow. Identify the correct activity for the blank.

Evaluation and Product Planning
B.
Product Planning and Evaluation
C.
Product Objective and Testing
D.
Product Development and Analysis
Q3.Corrective or Breakdown maintenance is define by________________ maintenance.
A.
Post, action
B.
Post, reaction
C.
Pre, action
D.
Pre, reaction
Q4.A repair work that is necessary when the process to be out of order is called .
A.
To preventive maintenance
B.
Predictive maintenance
C.
Corrective maintenance
D.
Equipment maintenance
Q5.Which of the following is NOT an element for maintenance management consideration.
A.
Size of maintenance staff
B.
Work orders
C.
Work scheduling
D.
Q6.Reliability is the performance of the system or an equipment is to work ________ for a given __________ when used under __________ conditions.
A.
Satisfactorily, period of time, specified operating
B.
Continuously, break of time, stress
C.
Intermittently, time, faulty
D.
Complete, task, demand
Q7.Which of the following is NOT an element for maintenance management consideration.
A.
Size of maintenance staff
B.
Work orders
C.
Work scheduling
D.
Repair parts inventory
Q8.Reliability is the performance of the system or an equipment is to work ________ for a given __________ when used under __________ conditions.
A.
Satisfactorily, period of time, specified operating
B.
Continuously, break of time, stress
C.
Intermittently, time, faulty
D.
Complete, task, demand
Q9.The purposes of maintenance are;
I. Maximize performance of production equipment efficiently
I. Prevent breakdown or failures
III. Minimize production loss from failures
IV. Increase reliability of the operating systems
A.
I, II and IV
B.
II, III and IV
C.
. I, III, and IV
D.
All of the above
Q10.In the Bathtub Curve reliability model, the hazard elements versus time comprise of;
I. Infant mortality
II. Constant failure rate
III. Maintenance period
IV. Breakdown period
V. Wear out period
A.
I, II and III
B.
. I, II and IV
C.
I, II and V
D.
I, III and V
Customer Need Product Research Product Design Production Customer Use Figure Q40Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts