Question: Q2 (a) Select Energy Conservation Measures (ECMS) from Table Q2 (a) to get the saving results as required by the saving criteria of the organisation,


Q2 (a) Select Energy Conservation Measures (ECMS) from Table Q2 (a) to get the saving results as required by the saving criteria of the organisation, also taking into account the investment criteria of the organization. Justify the choice (s). (2 marks) (b) Set up the implementation plan for the selected ECMs in Q2 (a) by taking ito account the resource requirement, saving criteria and investment criteria of the organization (3 marks) (c) An energy audit was conducted in one of the lecture halls in UTHM and found excessive ventilation air has been provided. This results in higher amount of energy consumption in the air-conditioning system. Based on the audit data provided in Table Q2 (C), evaluate: Amount of excess air provided for ventilation; (ii) Possible amount of electrical energy reduction. Psychrometric chait is provided in Figure Q2 (c); and (111) Total cost saving in a year if the building operates 300 days/year and 8 hours/day if the amount of excess air avoided. (10 marks) G Table Q2 (a) ECM Energy Saving Investment (RM) Payback (Year) 0.5 GJ 1,800.00 6,000.00 5,000.00 1,000.00 RM 3,000.00 9,000.00 15,000.00 10,000.00 Resource (Man-Day) Sup. Tech. 84 280 80 12 20 12 40 2 3 4 0.5 Eng. 28 8 5 4 1,500.00 4,500.00 15,000.00 3,000.00 Project Duration (week) Proc. Installation 16 12 8 0 12 32 0 4 24 Proc. 70 20 2 10 1.0 0.3 Energy Saving Criteria: Resource Availability: Year Target Energy > 5.0% > 5.0% > 5.0% Year 1 Year 2 Year 3 Engineer = 4 man-day per month Supervisor= 12 man-day per month Technician = 40 man-day per month Procurement staff = 10 man-day per month Cost > 1.0% > 1.0% > 1.0% Investment Criteria: Investment Criteria Target (from Baseline) Annual Budget RM 13,500.00 Payback period 5.0% > 5.0% > 5.0% Year 1 Year 2 Year 3 Engineer = 4 man-day per month Supervisor= 12 man-day per month Technician = 40 man-day per month Procurement staff = 10 man-day per month Cost > 1.0% > 1.0% > 1.0% Investment Criteria: Investment Criteria Target (from Baseline) Annual Budget RM 13,500.00 Payback period
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
