Question: Q2/ By using PERT Method, Solve the following ? 8 points Q2/ For the project described in table below, assume that the activity durations are

 Q2/ By using PERT Method, Solve the following ? 8 points

Q2/ By using PERT Method, Solve the following ? 8 points Q2/ For the project described in table below, assume that the activity durations are approximately normally distributed. Determine the probability to complete this project in (15 weeks). Activity Path a m b 1 2 3 (1,2) (2,3) B 2 4 6 1 3 5 D 2 5 8 (2,4) (4,5) (1,5) (5,6) E 2 3 4 F 1 2 3 3 Note that the activity (3,4) is a dummy activity