Question: Q4. Based on the project data provided in the table below, answer questions a) to d). (40 points) Slope Time (weeks) Normal Crash 9 6

Q4. Based on the project data provided in the

Q4. Based on the project data provided in the table below, answer questions a) to d). (40 points) Slope Time (weeks) Normal Crash 9 6 Max. Crash Time Activity A B 15 14 C 13 9 D 25 22 Cost (KD) Normal Crash 280000 310000 360000 500000 245000 275000 490000 515000 510000 540000 280000 320000 630000 710000 360000 390000 230000 310000 235000 285000 E 33 32 F 15 G 18 H 45 | 14 J 16 CPM is ACDEGIJ 13 16 41 10 15 a) Calculate the maximum crashing time (Max. Crash Time) and Slope for each activity. (20 points) b) Crash the project (reduce the duration) by 15 weeks and calculate the crashing cost. (5 points) c) What is the total cost of the project before and after crashing it by 8 weeks? Briefly explain the costs included in the calculations. (10 points) d) What can be the maximum crashing time for the overall project? Explain briefly. (5 points) Note: You need to show all the calculation steps in your Q4 answers

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!