Question: Q6. Consider the following pilot samples to construct the mean and range charts. The data below shows the size in CC. Construct the mean and

Q6. Consider the following pilot samples to construct the mean and range charts. The data below shows the size in CC. Construct the mean and range charts showing all control (action) -upper and lower limits, and warning upper and lower limits. Sample Number Item1 Item2 Item3 Item4 Sample 1 111.9 112.5 112.4 112.7 Sample 2 112.5 112.5 112.4 112.8 Sample 3 112.2 112.8 112.7 112 Sample 4 1 12.3 112.4 1 12.8 112.4 Sample 5 112.1 112.8 112.4 111.9 Sample 6 112.6 112.4 112.1 112.3 The following day, 6 samples were taken to check if the process under control or not. Theses samples are as follows: Sample Number Item1 Item2 Item3 Item4 Sample 1 111.9 111.5 112.4 112.3 Sample 2 112.5 111.5 113.4 1 11.8 Sample 3 112.2 111.8 111.7 112 Sample 4 114.3 111.4 111.8 113.4 Sample 5 115.1 111.8 112.4 110.9 Sample 6 111.6 110.4 110.1 115.3 Is the process under control? Why? What actions should you take
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
