Question: QUAL 8 3 4 6 Assignment # 2 Narrative Note to students: Please refer to the PowerPoint materials and in - class notes and refrain

QUAL8346 Assignment #2 Narrative
Note to students:
Please refer to the PowerPoint materials and in-class notes and refrain from using internet sources (such
as Google). Multiple different methodologies exist for building process flow diagrams, often with
conflicting information and requirements. Ensure that the process flow contains only actionable tasks
and follows the expected written structure documented within the provided in-class materials.
Process Observations
Canadian Coffee Bean Roasters (CCBR Ltd) wishes to see the full view of activities being conducted
within their new custom-built facility, starting with the receipt of raw materials ending with product
packaging. The process flow diagram requested by CCBR Ltd will document only the 'current state' of
activities with no improvements or modifications made to the design of the process. This document (an
AS-IS diagram) will serve to benchmark current performance so that CCBR Ltd can, at a future date,
implement enhancements and measure the effectiveness of future changes made against the current
performance.
On-site Analyst Observations:
Unit:
When processed, the coffee beans are referred to as a 'unit' of production. The exact measurement was
20Kg of coffee beans (post-processing) per unit. Therefore, each time a 'unit' is processed, exactly 20Kg
of coffee beans were processed.
Supporting Materials
To aid your understanding of the process, note the following supporting materials:
A floorplan of the facility; to help with visualization of the process execution
A Product Processing Tracking (PPT) Ledger Sheet to help with comprehension of process
tracking. This ledger is a book and used to track the ins and outs of coffee beans from the
various locations within the factory.
Stockroom Inventory is a online database (CCBR-INV-SYS) that records the type and quantity of
coffee beans.
A Warehouse Inventory & Sales Tracking Spreadsheet to show how inventory and sales are
current tracked and managed. Data from this spreadsheet comes from the CBR-INV-SYS
database.
These files will not contain unique information required to build the process flow, the information
within is contextual to assist in understanding the conceptual nature of the narrative, functionality of
the facility and employee work.
Process observations (In order of execution):
The weekly shipment of raw coffee beans will arrive from supplier at the loading bay in the Shipping
Department (SD), where the Processing & Receiving Department (PD) will receive the order. Coffee
beans are stored in stockroom until ready for processing.
The PD worker will retrieve the pump truck and picks up the Product Processing Tracking (PPT)
ledger sheet. The PD Worker will then transfer 20 KG (ie a skid) of product onto the pump
truck and bring the units to the main temporary Storage area in PD. Then pump truck is
immediately returned to its designated bay. The PD worker will update the stockroom
inventory system (CCBR-INV-SYS) to reflect the units removed.
PD worker next calibrates the Huller Machine and will step through a repetitive series of steps
wherein the PD worker will need to add 1 unit at a time to the machine that is currently being
utilized. Here is how they add 1 unit:
1) Retrieve 1 unit of Coffee Beans from PD Temporary Storage area.
2) Add 1 unit of Coffee Beans to the machines hopper1
3) Process unit through the machinery
4) Remove the processed unit from machinery and transfer the processed
unit of coffee beans into the transfer bin.
5) Record processing result(s) in Product Processing Tracking Ledger sheet2
6) Place transfer bin in temporary storage
After the Huller Machine processes each unit in that manufacturing cell, there will be an amount of
waste produced, which the machine automatically separated from the product. This
waste must be discarded in the nearby waste bin. After all the 20 units have been
processed, this waste bin will be emptied in the dumpster located outside the
Receiving Department loading bay.
PD worker will proceed to calibrate the Cleaning Machine. To clean the beans, the
steps are similar to the Huller machine but adding one additional step. After steps 1
6 has been completed, PD worker will be required to check the Cleaning Machine for
any areas where the machine may have become clogged. If the machine is clogged,
then PD worker will utilize an automatic washer to clear out any blockages. The
cleaning cycle may take up to 10 minutes, upon completion the worker will doublecheck
to ensure that the machine has been properly cleansed. If it remains clogged, then the cleaning
cycle will repeat.
Upon completion of cleaning, a member from the Quality Control
Department (QCD Worker) will retrieve a 2-gram sample from
each of the units transfer bins. This sample will be added to the
Grading Machine, which will automatically test the coffee beans
for acidity level, roasting level and quality.create a process flow diagram

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!