Question: QUESTION 1 - 1 0 0 marks A concrete floor slab is built integrally with a beam so that ' T ' action can be

QUESTION 1-100 marks
A concrete floor slab is built integrally with a beam so that 'T' action can be considered
as shown in the cross section from figure 2. The beam is part of a frame in a multi-storey building. The bending moment diagram from two ultimate limit state loading
conditions between the column faces is also shown below (in Figure 1).
(a) Determine the top and bottom reinforcement for the beam presented in the
next figures. Check for maximum and minimum steel. Bar spacing is the
smaller of 25mm or bar diameter. Do not use bars greater than 30mm.
73 marks
(b) Calculate the maximum design shear force at the column face that can be
resisted by 3 legged R10 stirrups at 150mm centres.
(c) Sketch cross sections of the beam at the mid-span and column face.
6 marks
Assume for:
-concrete: specified compressive strength=40 MPa; cover =30mm; maximum concrete strain =0.003
- steel: main bars = Grade 500; stirrups = Grade 300; modulus elasticity =200GPa
Fig 1- Bending Moment Diagram (kNm)
Fig 2- Beam section
QUESTION 1 - 1 0 0 marks A concrete floor slab is

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!