Question 1 (1 point) Saved Consider a project with the following network diagram. D B F G E The information related to project crashing is shown in the following table. Normal Crash Duration Normal Duration Crash Activity (hours) Cost ($) (hours) Cost (S) A 2 10 2 10 B 3 15 2 23 5 25 4 27 D 3 20 1 24 E 6 30 4 45 F 1 5 1 5 G 7 35 6 50 H 10 50 7 80 If we want to reduce the project duration by 3 hours, what will be the cost of crashing