Question: Question 1 ( 1 point ) Saved The gross requirements at one level of an MRP plan determine the gross requirements at the next lower

Question 1(1 point)
Saved
The gross requirements at one level of an MRP plan determine the gross requirements at the next lower level.
True
False
Question 2(1 point)
Saved
A zero safety stock implies that both the lead time and the demand rate are constant.
True
False
Question 3(1 point)
Saved
In sampling for quality inspection, process distribution and sampling distribution are the same thing.
True
False