Question: Question 1 1 pts Question 1) Large batches do all of the following, EXCEPT: Increase WIP Increase set up frequency Increase the time to process

Question 1 1 pts Question 1) Large batches do all
Question 1 1 pts Question 1) Large batches do all
Question 1 1 pts Question 1) Large batches do all of the following, EXCEPT: Increase WIP Increase set up frequency Increase the time to process a batch at each station (batch cycle time) O Increase flow times Question 2) In an M/M/1 system, the coefficient of variability for arrivals is equal to 1 (Ca=1). True or False? True O False Question 3 1 pts Question 3) In an M/D/1 system, the coefficient of variability for service is equal to 1 (Cs=1). True or False? True False