Due to the current challenge of power, you have been tasked to investigate
preliminarily the feasibility of constructing a small hydropower scheme power station
in the catchment surrounding Kalkfontein Dam of South Africa. The elevation of the
site of construction is at the elevation of of the dam height. Assume that the
efficiency factor is and the volume of water released from the dam is of the
water volume equivalent to megaliter in days that could be released at a given
site. The investigation is restricted to the power output generation associated with the
energy of the power station.