Question: QUESTION 1 ( 2 5 ) Due to the current challenge of power, you have been tasked to investigate preliminarily the feasibility of constructing a

QUESTION 1(25)
Due to the current challenge of power, you have been tasked to investigate
preliminarily the feasibility of constructing a small hydropower scheme (power station)
in the catchment surrounding Kalkfontein Dam of South Africa. The elevation of the
site of construction is at the elevation of 85% of the dam height. Assume that the
efficiency factor is 85% and the volume of water released from the dam is 200% of the
water volume (equivalent to 0.2 megaliter in 2 days) that could be released at a given
site. The investigation is restricted to the power output generation associated with the
energy of the power station.
QUESTION 1 ( 2 5 ) Due to the current challenge

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!