Question: Question 1 ( 2 5 marks ) An 8 m tunnel with dimension as shown in Figure Al is to be excavated by drill and

Question 1(25 marks)
An 8 m tunnel with dimension as shown in Figure Al is to be excavated by drill and blast method at a depth of 50 m below ground.
After blasting, a geologist mapped the face with the rock condition shown in Figure A2.
The conditions of the joints can be summarized as follows:
\begin{tabular}{|c|c|c|c|c|c|c|}
\hline Type & Dip /DIp Direction & Spacing (mm) & \begin{tabular}{l}
Persistence \\
(m)
\end{tabular} & Roughness & Aperture (mm) & Infiliting \\
\hline J. & 85.\(1440^{\circ}\) & 100-1000 & \(>6\) & Smosth blanar & \(0-2\) & \(\mathrm{Fe}^{+}\)stained \\
\hline \( J_{2}\) & 85\%\(1110^{\circ}\) & \(100-300\) & \(>6\) & Simsoth planar & 0-2 & charite/uDalas a \\
\hline Js & \(80^{\circ}/020^{\circ}\) & 200-800 & \(>6\) & Simooth Planar & \(0-2\) & \(\mathrm{Fe}^{+}\)\\
\hline \( J_{4}\) & \(10^{1}\%\) & \(200-800\) & \(>5\) & Swooth planar & 0-2 & stained \\
\hline
\end{tabular}
It will be a railway tunnel, concrete-lined within 2 years after excavation, and the rock is granite with UCS greater than \(70\mathrm{MPa},\mathrm{RQD}\) is 65 and dry.
It will be a railway tunnel, concrete-lined within 2 years after excavation, and the rock is granite with UCS greater than \(70\mathrm{MPa},\mathrm{RQD}\) is 65 and dry.
Assume \(\mathrm{ESR}=1.3\) for tunnel and \(\mathrm{SRF}=2.5\).
Based on this information, estimate the Q value of this mapped face and provide the support class, bolt length and unsupported span for the crown and wall based on the chart in Figure A3:
4) Systematic bolting. (and unreinforced shotcrete, 4-10 cm ) eirforced nos or mowcreve and porung
5) Fibre reinforced shotcrete and bolting. \(5.9\mathrm{~cm}\quad \)9) Cast concrete lining
E) Energy absorption in fibre reinforced shotcrete at 25 mm bending during plate testing
D55\% Reinforced shotgrete ribs: 6 reinforcement bars in double layers in 55 cm thick ribs with certre to centre (oic) specing 1.2 m
cic 1.2 Each box corresponds to \( Q \)-values of the left side of the box, as indicated.
Figure 2- Updated Q-chart (Grimstad et al,2003)
Figure A3. Design Support Class
Provide justification or assumption for each parameter you selected and show your calculation and support class in Figure A3.
Question 1 ( 2 5 marks ) An 8 m tunnel with

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!