Question: QUESTION 1 [ 2 5 MARKS ] Define the term earthworks. A contractor has excavated a 4 2 0 0 m long trench with an

QUESTION 1
[25 MARKS]
Define the term "earthworks".
A contractor has excavated a 4200m long trench with an average width of 2.0m and long section as follows:
L=1200m
Int
|ataria|
The following rates of payment are applicable:
Soft material
Soft material excavation, excavation depth 0 to 1m below natural ground level: R55 per m3
Soft material excavation, excavation depth >1m to 2m below natural ground level: R65 per m3
Intermediate material
Intermediate excavation, excavation depth 0 to 1.5m below natural ground level: R75 per m3
Intermediate excavation, excavation depth >1.5m to 3.0m below natural ground level: R85 per m3
Hard material
Hard excavation, excavation depth 0 to 1.5m below natural ground level: R110 per m3
Hard excavation, excavation depth exceeding 1.5m below natural ground level: R130 per m^3 Calculate the payment due to the contractor for the excavation of the trench.
3
END
EPN2601 MAJOR TEST 12024-Sem 1
Explain what the OMC (optimum moisture content) of a soil is and why it is important for the purpose of road construction.
(2)
Why is topsoil stripped and stockpiled during road construction?
(2)
On a road construction project, the specified free-haul distance is 1,0km. The contractor has hauled materials on site during the month of June 2021 and now wants to claim for payment for overhaul. The contractor is unsure how to calculate his total claim for haul and presents you with the following information:
\table[[\table[[Volume of material hauled],[(m3)
QUESTION 1 [ 2 5 MARKS ] Define the term

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!