Question: QUESTION 1 (40) As an engineering technologist, you have been tasked to assess hydropower development on one catchment surrounding a tributary of the Mooi River.

QUESTION 1 (40) As an engineering technologist, you have been tasked to assess hydropower development on one catchment surrounding a tributary of the Mooi River. For this purpose, 6 potential sites have been identified and their data have been summarised in Table 1. Site ID Effective head Efficiency factor (cm) (%) A 8500 80 B 8000 85 C 8200 75 D 7900 70 E 8300 80 F 8100 87 1.1. Considering a maximum allowable flow rate of 420 m /min for each site, determine graphically Flow rate (m'/s)-x axis versus Power (Kw)-y axis. (15) 1.2. Perform a comparative analysis for this problem, based on the outcome in 1.1 ( 15 )

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Mathematics Questions!