Question: Question 1 : , ( 5 0 marks ) Design a ( from 1 s t principles ) drilling, charging and timing round for a

Question 1: ,(50 marks)
Design a (from 1st principles) drilling, charging and timing round for a rectangular tunnel with the
following dimensions: Height -3.3 m , width -3.7 m in a friable quartzite. Do not make use of a
computer model.
The proposed hole diameter is 48 mm . Final drill hole length is 3.3 m on a mechanised drill. Select:
an ANFO explosives type in your first proposed design and
bulk emulsion type explosives for the second design.
You may select your own initiation system ?s for the 2 different designs. Compare the drilling and
blasting cost per m3 between the ANFO design and the bulk emulsion design.
Assume a drilling cost of R44.50 per metre. ANFO => R13.00/kg, Emulsion => R14.75/kg, In-hole
detonator => R42.50/unit and tamping cartridges => R 2.30/unit.
The average advance per blast is 3.1 m for the ANFO blast and 3.2 m for the emulsion blast.
Do you agree with the advances? Clearly show all the assumptions you are making.
Complete the table below and discuss the costs. (Plan design is to the full drill depth and the actual is
to the full drill depth minus the socket remaining after the blast)
Costs per metre = costs per metre advance .
Question 1 : , ( 5 0 marks ) Design a ( from 1 s

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!