Question: Question 1 . As an industrial engineer, you are working on a logistics optimization project for ABC Pharmaceuticals. The company aims to deliver its medicines

Question 1. As an industrial engineer, you are working on a logistics optimization project for ABC Pharmaceuticals. The company aims to deliver its medicines from the central depot to various pharmacies in the most efficient and cost-effective way. The distribution network of the company consists of a total of 11 nodes, including the central depot and 10 pharmacies. Since pharmacies 2,4, and 7 are located in nearby regions, the company wants these pharmacies to be visited consecutively. Since pharmacies 5 and 6 are located in different city centers, it is important that they are not visited consecutively. Additionally, as pharmacy 10 does not require the delivery of critical or sensitive medicines, it should be visited only after all other pharmacies have been visited.
There is a medicine distribution network consisting of 1 depot and 10 pharmacies, making a total of 11 nodes. The company wants to deliver its medicines to pharmacies on time and in a costeffective manner. The following constraints must be satisfied:
- Pharmacies 2,4, and 7 must be visited consecutively (the order does not matter).
- Pharmacies 5 and 6 must not be visited consecutively.
- Pharmacy 10 must be visited after all other pharmacies.
a) How many feasible delivery routes are there under these conditions?
b) Write the mathematical model for the related TSP problem (including the constraints that mentioned above.)
 Question 1. As an industrial engineer, you are working on a

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!