Question: QUESTION 1 Below shown three - story building is constructed with ( 3 8 times 2 3 5 mathrm { ~mm }
QUESTION
Below shown threestory building is constructed with times mathrm~mm solid sawn floor joists on all storeys, and times mathrm~mm SPF NoNo bottom and top plates. The third and secondstorey walls have double top plates and single bottom plates, and the first storey has a double top plate and a sill plate. You are asked to reasonably anticipate the total shrinkage of the building one year after construction when the wood EMC is at and if the builder used wood stamped. Calculate the shrinkage when ;
SGREEN and a technician using a moisture meter measured MC up to in a pile of wood;
SDRY Condition
mathrmMC
Do you have recommendations to give to the builder? If so what are they?
Note: Use the Dimensional Change equation provided in the manual and consider changes in all three primary directions. Assume the FSP is following the same solution we did in the class example
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock