Question: Question 1 Given the analysis below from an L.P. problem, answer the following questions, Round all your answers to the nearest WHOLE number. The optimal


Question 1 Given the analysis below from an L.P. problem, answer the following questions, Round all your answers to the nearest WHOLE number. The optimal production schedule calls for units of AA. The projected profit for the optimal solution will be Dollars. The greatest increase in profit would come from adding overtime to constraint number Due to new costs, the company would like to increase the profit contribution of each variable. For which variable would doing this ca For which constraint would an increase of even 20 units cause NO change in the optimal solution? Optimal Objective Value 578.9541 Variable Reduc AA Value 57.9164 13.0157 0.0000 BB 1.5588 63.4991 Constraint 0.0000 - Nm Slack/Surplus 0.0000 8.9876 0.0000 ch C FI Optimal Objective Value 578.9541 Variable Value Reduced Cost AA 57.9164 0.0000 BB 13.0157 1.5588 63.4991 0.0000 Constraint Slack/Surplus Dual Value 1 0.0000 95000 2 8.9876 0.0000 3 0.0000 1.9998 4 5.2999 0.0000 Variable ObjCoeff Allowinch AllowDecr AA 5.0000 1.3333 6.5000 BB 2.5000 Infinite 2.5000 CC 7.0000 15.4545 4.3535 Constraint RHS Value Allowinch AllowDecr 1 56.0000 1.5555 5.0000 Infinite 2 43.5000 22.0000 3 15.0000 3.7500 12.0000 4 63.5000 18.1818 6.5000 Moving to the next question prevents changes to this
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
