Question: Question 1 Managing the Risk Management Function CLO6 (20 Marks) Out of 110 diesel engines tested, a rework and repair facility found 9 had leaky
Question 1 Managing the Risk Management Function CLO6 (20 Marks)
- Out of 110 diesel engines tested, a rework and repair facility found 9 had leaky water pumps, 15 had faulty cylinders, 4 had ignition problems, 52 had oil leaks, and 30 had cracked blocks. Draw a Pareto chart to identify the key problem in the production process. (4 marks)
- Describe the difference between assignable variation and chance variation. (2 Marks)
- Describe the difference between an attribute control chart and a variable control chart. (2 Marks)
- Samples of size 5 are selected from a manufacturing process. The mean of the sample ranges is .50. What is the estimate of the standard deviation of the population? (3 marks)
- Explain what do you mean by FEMA? (3 Marks)
- What are the three steps for Root cause analysis? (2+2+2=6 Marks) Question 2 Risk Financing CLO4 (20 Marks)1
- What is the general characteristics of Risk Financing - Risk Retention Methods (2 marks)
- Outline two (2) Risk Financing - Risk Retention Methods and two (2) Risk Financing - Tranfer Methods (2+2+2+2=8 Marks)
- Outline two (2) Benefits of Insurance to Society. (2+2= 4 Marks)
- Using the table below show and explain whether the two assets A and B are ideal for Hedging (6 Marks)
YEAR | Return A | Return B |
2010 | 32% | 5% |
2011 | 14% | 15% |
2012 | 4% | 25% |