Upstream water level (H1)=20m
Downstream water level (H2)=5m
Thickness of the sandy layer =1.5m
Length of dam (L)=66m
Diameter of soil specimen (tested in the lab for permeability)=150mm
Length of the specimen =300mm
Porosity =39%
Water collected in 22 seconds =83ml
Pressure head (Constant)=19.2cm
Specific gravity of sand =2.66
Determine:
a) Rate of seepage per unit length of the dam (in m3hrm).
b) Seepage velocity in ms.
c) Quantity (in liters) of seepage per day if the dam is 410m long.
Question 1 Seepage is occurring through the sandy

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!