Question: Question 1 ( Shart elnkling ) A 9 m diameter shaft is being sunk through a rock with a ( true ) density of 2
Question Shart elnkling
A m diameter shaft is being sunk through a rock with a true density of with a swell factor of at a rate of of m per day. The shaft in eqiipped with kibbles that have m diameter and are high
What tonnage of rock must be hoisted to surface each day?
How many kibble loads must be hoisted to surface each day to remove broken rocknirocking a kibble has a filfilling factor of
You are told that thete are two shifts per day working at the mine with a m advance per shift required to achieve m daily advance. The mine operates at two hour cyclescycles and the allocated cleaning time per shift is hours