Question: Question 1 ( Shart elnkling ) A 9 m diameter shaft is being sunk through a rock with a ( true ) density of 2

Question 1(Shart elnkling)
A 9m diameter shaft is being sunk through a rock with a (true) density of 2.7m3 with a swell factor of 15% at a rate of of 6m per day. The shaft in eqiipped with kibbles that have 2 m diameter and are 2m high
1.1 What tonnage of rock must be hoisted to surface each day?
1.2 How many kibble loads must be hoisted to surface each day to remove broken rocknirocking a kibble has a filfilling factor of 80%?
(4)
1.3 You are told that thete are two shifts per day working at the mine with a 3m advance per shift required to achieve 6m daily advance. The mine operates at 12 two 12-hour cyclescycles and the allocated cleaning time per shift is 6 hours
 Question 1(Shart elnkling) A 9m diameter shaft is being sunk through

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!