Question: Question 1 The analysis findings for a four phase, pretimed intersection are summarized in the Table below. Pedestrians were not considered in the analysis.

Question 1
The analysis findings for a four phase, pretimed intersection are summarized in the Table below. Pedestrians were not considered in the analysis.
\table[[Phase,\table[[C],[length]],Yellow + Red clearance,Available cycle length,Flow ratios,CS,\table[[Green],[(sec)]]],[A,125,3+1,\table[[109 sec],[(a)]],0.282,0.809,37.995],[B,3+1,0.218,29.372],[C,3+1,0.162,21.827],[D,3+1,0.147,19.806(b)]]
C = optimal cycle length calculated using Webster's equation.
CS = sum of the critical flow ratios.
1.1 Show the calculations leading to the values marked as (a) and (b).
(4)
1.2 What is the total time allocated to phase B (explain your answer)?
(2)
1.3 Assume the green times for Phase A, B, C, and D are rounded to 38,29,22, and 20 sec ., respectively. Draw a neat, labelled signalization strip diagram.
(4)
[10 marks]
Question 1 The analysis findings for a four

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!