Question: QUESTION 1 To complete the rotor assembly for an experimental spacecraft, Gilbert has laid out nine major activities involved. These activities have been labelled Ato

QUESTION 1 To complete the rotor assembly for an
QUESTION 1 To complete the rotor assembly for an experimental spacecraft, Gilbert has laid out nine major activities involved. These activities have been labelled Ato I in the table below, which also shows the ir estimated completion times (in weeks) and their immediate predecessors. EVENTS AND ACTIVITIES FOR ROTOR ASSEMBLY a m 9 Activities Times (in week) Preceding Event b A 1 2 3 B 2 3 4 A 4 5 6 A D 8 10 A E 2 5 8 B F 4 5 6 B, C G 1 2 3 ED H 1 3 5 EF 1 2 4 6 HG Key: a is optimist time, m is the most likely time and b is the pessimistic time. i. (9) Calculate the expected time for each activity Draw a Gantt Chart from the same information above ii. (7) State the critical path and the maximum number of weeks the project will take to be completed. (3) What are the pros and cons of using the Gantt chart as a planning and scheduling tool? (6) iv

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock