Question: Question 1 to Question 1 0 is based on this question. The GED Corporation manufactures two electrical devices: generators and alternators. Both of these products

Question 1 to Question 10 is based on this question.
The GED Corporation manufactures two electrical devices: generators and alternators. Both of these products require wiring and testing during the assembly process. Each generator requires 2 hours of wiring and 1 hour of testing and can be sold for a $250 profit. Each alternator requires 3 hours of wiring and 2 hours of testing and can be sold for a $150 profit. There are 260 hours of wiring and 140 hours of testing time available in the next production period and GED wants to maximize profit.
The LP formulation is as follows:
Let X1= Number of generators to produce
X2= Number of alternators to produce
Max 250X1+150X2
Subject to:
2X1+3X2<=260(Wiring)
1X1+2X2<=140(Testing)
X1, X2>=0
Implement the above LP problem in Excel. Use Solver to solve the problem and create a Sensitivity Report. Use this information to answer the following questions:
Question 1: What is the optimal solution?
A.X1=100, X2=20
B.X1=0, X2=70
C.X1=130, X2=0
D.X1=120, X2=30
E. X1=0, X2=0
Question 2: What is the optimal objective function value?
A.28000
B.10500
C.32500
D.34500
E.0
Question 3: Which value can the unit profit of generator be without changing the optimal solution?
A.90
B.500
C.20
D.5
Question 4: Which value can the unit profit of alternator be without changing the optimal solution?
A.350
B.400
C.550
D.800
Question 5: Which of the following statement is not true?
A. The allowable decrease in X1 is 150 which means if the objective function coefficient for X1 is less than 100 the optimal solution will change.
B. The allowable increase in X2 is 225 which means if the objective function coefficient for X2 is larger than 375 the optimal solution will change.
C.The optimal solution to this problem is unique.
D. There are multiple optimal solutions to this problem.
Question 6: If we force X2 to be 1, the optimal objective function value will _________ Hint: Think about the definition of reduced cost
A. decrease by 225
B. increase by 225
C. decrease by by 150
D. decrease by 125
Question 7: Which statement regarding the shadow price of the Testing time constraint is true?
A.The shadow price of the second constraint is positive because the shadow price of a slack constraint is always positive.
B.The shadow price of the second constraint is negative because the shadow price of a slack constraint is always negative.
C.The shadow price of the second constraint is zero because the shadow price of a slack constraint is always 0.
D.There is no way to know about the shadow price of the second constraint without the sensitivity report.
Question 8: What is the optimal objective function value if the wiring time availability changes from 260 to 270?
A.33750
B.19950
C.36000
D.10350
Question 9: What is the reduced cost of alternator if it only needs 2 hours of wiring?
A.100
B.25
C.0
D.-25
E.-100
If alternator only needs 2 hours of wiring instead of 3 hours, which statement is true?
A. It will be worthwhile to produce alternator because the reduced cost will be positive.
B.It will be not worthwhile to produce alternator because the reduced cost will be positive.
C. It will be worthwhile to produce alternator because the reduced cost will be negative.
D. It will be not worthwhile to produce alternator because the reduced cost will be negative.
E. It will be not worthwhile to produce alternator because the reduced cost will be zero.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!