Question: QUESTION 13 2 point The specifications for a plastic liner for the concrete highway project calls for a thickness of 3.0 mm 1 mm. The

QUESTION 13 2 point The specifications for a

QUESTION 13 2 point The specifications for a plastic liner for the concrete highway project calls for a thickness of 3.0 mm 1 mm. The standard deviation of the process is estimated to be .02 mm. The process is known to operate at a mean thickness of 3.0 mm. What is the Cpk for this process? 0.372 0.674 1.67 1.753