Question: = Question 16 This Test: 62 pts possible Submit Test The following table details the tasks required for Indiana-based Frank Pianki Industries to manufacture a

= Question 16 This Test: 62 pts possible Submit

= Question 16 This Test: 62 pts possible Submit Test The following table details the tasks required for Indiana-based Frank Pianki Industries to manufacture a fully portable industrial vacuum cleaner. The times in the table are in minutes. Demand forecasts indicate a need to operate with a cycle time of 10 minutes. Fig. 1 Predecessors B Fig. 2 Performance Activity Activity Description Time (mins) A Attach wheels to tub 5.0 B Attach motor to lid 1.6 Attach battery pack 2.8 D Attach safety cutoff 4.0 E Attach filters 3.0 F Attach lid to tub 2.0 G Assemble 3.2 attachments H Function test 4.0 1 Final inspection 2.0 J Packing 2.0 B A, E FERD D, F, G H 1 Fig. 3 a-b) One of the possible assignment of tasks to workstations is shown correctly in % The efficiency of the assembly line with 3 workstations = (enter your response rounded to two decimal places). c) The goal is to have 100% efficiency. Is this possible? d) The theoretical minimum number of workstations =(round your response up to the next whole number)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!