Question: Question 17 (1 point) Yelkao sunglasses is developing sunglasses based on a modular design concept (frame style, lens type, and storage case) that consumers could

Question 17 (1 point) Yelkao sunglasses isQuestion 17 (1 point) Yelkao sunglasses isQuestion 17 (1 point) Yelkao sunglasses is

Question 17 (1 point) Yelkao sunglasses is developing sunglasses based on a modular design concept (frame style, lens type, and storage case) that consumers could order direct from their website and have it shipped within 24 hours. They want launch the product with a campaign that emphasizes "over 2000 combinations" are possible for consumers to choose from. So far, Yelkao has developed 18 different frame styles, which are all compatible with 14 different lens types. What is the minimum number of storage case options (assuming they are compatible with all possible frame style and lens type combinations) they must develop to meet their marketing campaign goal? a) 10 b) 7 c) 9 d) 8 8 e) 32 Question 23 (1 point) Which of the following statements is FALSE? a) A measurement falling more than three standard deviations away from the central line indicates an out of control process b) A stable process that is in control is capable c) A process can continue to be capable after a shift in the mean of measurements d) An in control process shows common variation e) A process may require investigation even if all measurements fall within control limits Question 19 (1 point) You are responsible for ordering and transporting 9000 Christmas stocking from a supplier in China to all Canadian Tire retail stores in Western Canada for November 1st. The supplier requires a total of 4 weeks to manufacture the stocking (3 weeks for ordering their raw materials and 1 week for their production). Loading and transporting the intermodal containers to the port in China will take 2 weeks. Ocean transport to Vancouver will take 3 weeks. Ship unloading and rail transport from Vancouver to the distribution centre in Calgary will take 1 week. Unloading the intermodal containers and getting the stocking shipped to each retail store will take 1 week. Any stocking that remains unsold 3 weeks after Christmas will be returned to the distribution centre. How many weeks before the sale date should the intermodal containers be delivered to the supplier? a) Not enough information provided b) 11 weeks c) 7 weeks d) 6 weeks e) 10 weeks

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!