Question: QUESTION 18 Process Design using small lot size could increase the ordering costs and the shipping costs. True False 1 points QUESTION 19 In a

QUESTION 18

Process Design using small lot size could increase the ordering costs and the shipping costs.

True

False

1 points

QUESTION 19

  1. In a PERT chart, the Early Finish of a task is always equal to the Early Start of the following task(s).

    True

    False

1 points

QUESTION 20

The four building blocks of JIT are: product design, process design, personnel/organizational elements, and planning and control.

True

False

1 points

QUESTION 21

In a broad sense, JIT is not identical to lean production.

True

False

1 points

QUESTION 22

The Critical PATH in a PERT chart shows the shortest path from the start to the end of a project.

True

False

1 points

QUESTION 23

A Kanban card is used to signal that work is ready to be moved to the next station.

True

False

1 points

QUESTION 24

Continuous Improvement (Kaizen) is a Japanese methodology that is used mainly for the production lines

True

False

1 points

QUESTION 25

Just In Time Systems work for either a Pull or a Push system

True

False

1 points

QUESTION 26

Both reliability and serviceability are quality dimension for a service

True

False

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!