Question: QUESTION 19 Contingency needed for a project should incorporate a. much needed contingency due to lack of estimation accuracy. b. the contingency required to cover
QUESTION 19
-
Contingency needed for a project should incorporate
a. much needed contingency due to lack of estimation accuracy.
b. the contingency required to cover potential strategic risks.
c. the contingency needed to address safety risks
d. all of the above plus operations risks contingency