Question: Question 2 0 ( 1 point ) Saved In a process with simultaneous, substitutable operations ( parallel operators who do the exact same thing and

Question 20(1 point)
Saved
In a process with simultaneous, substitutable operations (parallel operators who do the exact same thing and the unit goes through only one operator), we can add up activity times over all possible paths of a flow unit to find the process cycle time.
Question 20 options:
True
False