Question: Question 2 ( 1 0 0 Marks ) a . ( i ) You are the surveyor for a high rise 4 5 m tall.
Question Marks
a
i You are the surveyor for a high rise m tall. You have decided to place external ground control marks based upon an observer vertical circle depression angle of Calculate the horizontal distance for the external control mark to be visible from the top of the building. marks
ii The building has an absolute position tolerance of mm in any direction. You undertook some checks for your grid to the external control points at a building height of m By grid sight hole your coordinated position is m E and m N by resection to external control points your position is E and N Briefly discuss why and whether you should be concerned or not marks Nominate two field measures you would undertake prior to any corrective actions, if required. marksTotal marks
b A surveyor is tasked to check the verticality of a fourstory building with precast walls installed. There are reflective tapes on top of each precast wall and below observations are reduced after a couple of readings. Carry out the necessary calculations for the task and interpret the results if the given tolerance is mm marks
Target
Zenith angle
Slope distance
Horizontal angle
tableWall block A
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock