Question: QUESTION 2 ( 1 0 Marks ) The product design and development team at CGH Manufacturing Enterprises has completed the development of a prototype of

QUESTION 2(10 Marks)
The product design and development team at CGH Manufacturing Enterprises has completed the development of a
prototype of a product to be manufactured during the forthcoming quarter. The prototype passed through the three
production departments A, B, and C. The following budgeted information on the prototype is available:
The following information relates to the prototype:
Direct material requisitioned R97470.43
Direct material returned to store R1396.00
Direct labour recorded against the prototype:
Production department A 146 hours at R48.00 per hour
Production department B 39 hours at R57.00 per hour
Production department C 279 hours at R61.00 per hour
A special machine was hired for the production of the prototype at a cost of R590.00.
Machine hours recorded against the prototype:
Production department A 411 hours
Production department B 657 hours
Production department C 502 hours
Price quoted for the prototype, including delivery R172000.
CGH Manufacturing Enterprises absorbs non-production overhead using the following pre-determined overhead
absorption rates:
Administration and general overhead 10% of production costs
Selling and distribution overhead 12% of selling price
REQUIRED:
The product design and development team is convinced that the manufacturing and non-manufacturing costs of the
prototype are unlikely to be significantly different from those of the product. Therefore, present an analysis of the total cost
and profit or loss attributable to a unit of the product.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!