Question: QUESTION 2 [ 1 8 Marks ] ELO QUESTION The folowing information ( Table 1 ) is available for a proposed new dam site in

QUESTION 2[18 Marks]
ELO QUESTION
The folowing information (Table 1) is available for a proposed new dam site in Durban Area.
When the reservoir level was at 432.5 m , the following flood hydrograph entered the reservoir:
2.1(a) Determine the bathymetric constants \( a \) and \( b \).
(b) how much water stored between 546 m and 550 m contours
Hydraulics HMG3B (Summer)
2.2(a) Route the flood using Level Pool Method.
(Assume reservoir was empty initially)
(b) Estimate the flood attenuation and lag times