Question: QUESTION 2 [ 1 8 Marks ] ELO QUESTION The folowing information ( Table 1 ) is available for a proposed new dam site in
QUESTION Marks
ELO QUESTION
The folowing information Table is available for a proposed new dam site in Durban Area.
When the reservoir level was at m the following flood hydrograph entered the reservoir:
a Determine the bathymetric constants a and b
b how much water stored between m and m contours
Hydraulics HMGB Summer
a Route the flood using Level Pool Method.
Assume reservoir was empty initially
b Estimate the flood attenuation and lag times