Question: Question 2 (1 point) Project control requires the project manager to use information to steer the project through rough spots. Question 2 options: True False
Question 2 (1 point)
Project control requires the project manager to use information to steer the project through rough spots.
Question 2 options:
| True | |
| False |
Question 3 (1 point)
A Tracking Gantt chart is used to measure the costs accrued during the project process.
Question 3 options:
| True | |
| False |
Question 4 (1 point)
Scope creep is always a negative aspect of a project and should always be avoided.
Question 4 options:
| True | |
| False |
Question 5 (1 point)
Three direct costs are typically included in baselines.
Question 5 options:
| True | |
| False |