Question: Question 2 (1 point) Station 2 Machine A Station 4 Machine A 60 min/unit Station 1 Station 3 Station 4 Machine B 60 min/unit Station




Question 2 (1 point) Station 2 Machine A Station 4 Machine A 60 min/unit Station 1 Station 3 Station 4 Machine B 60 min/unit Station 2 Machine B Station 4 Machine C 60 min/unit A manufacturing plant has four stations in the assembly line (illustrated in the image above). A unit needs to be processed at either Machine A or Machine B for Station 2 (parallel lines, both lines doing the exact same thing). The box is then processed at Station 3. After that, the unit needs to be processed at either Machine A, Machine B or Machine C in Station 4 (parallel lines, all lines doing the exact same thing) before leaving the production line. The process times of the individual stations/machines are shown as follows. Station 1: 7 minutes Station 2: Machine A, 44 minutes; Machine B, 44 minutes A manufacturing plant has four stations in the assembly line (illustrated in the image above). A unit needs to be processed at either Machine A or Machine B for Station 2 (parallel lines, both lines doing the exact same thing). The box is then processed at Station 3. After that, the unit needs to be processed at either Machine A, Machine B or Machine C in Station 4 (parallel lines, all lines doing the exact same thing) before leaving the production line. The process times of the individual stations/machines are shown as follows. Station 1: 7 minutes Station 2: Machine A, 44 minutes; Machine B, 44 minutes Station 3: 16 minutes Station 4: 60 minutes for each machine (as shown in the flowchart) Suppose that the input rate to the process is equal to the capacity of the whole process. What is the utilization of Machine A at Station 2? Note: Enter your answer as a percentage number, but do not include the % symbol. Round your final answer to 2 decimal places. For example, if your answer is 12.345%, enter 12.35. Your Answer: Question 5 (1 point) Station 2 Machine A Station 4 Machine A 60 min/unit Station 1 Station 3 Station 4 Machine B 60 min/unit Station 2 Machine B Station 4 Machine C 60 min/unit A manufacturing plant has four stations in the assembly line (illustrated in the image above). A unit needs to be processed at either Machine A or Machine B for Station 2 (parallel lines, both lines doing the exact same thing). The box is then processed at Station 3. After that, the unit needs to be processed at either Machine A, Machine B or Machine C in Station 4 before leaving the production line. The process times of the individual stations/machines are shown as follows. Station 1: 12 minutes Station 2: Machine A, 52 minutes; Machine B, 52 minutes Station 2 Machine B Station 4 Machine C 60 min/unit A manufacturing plant has four stations in the assembly line (illustrated in the image above). A unit needs to be processed at either Machine A or Machine B for Station 2 (parallel lines, both lines doing the exact same thing). The box is then processed at Station 3. After that, the unit needs to be processed at either Machine A, Machine B or Machine C in Station 4 before leaving the production line. The process times of the individual stations/machines are shown as follows. Station 1: 12 minutes Station 2: Machine A, 52 minutes; Machine B, 52 minutes Station 3: 17 minutes Station 4: 60 minutes for each machine (as shown in the flowchart) Suppose that the input rate to the process is equal to the capacity of the whole process. What is the utilization of Machine C at Station 4? Note: Enter your answer as a percentage number, but do not include the % symbol. Round your final answer to 2 decimal places. For example, if your answer is 12.345%, enter 12.35. Your