Question: QUESTION 2 10 points Save Answer In a job shop, effective capacity is only 69 percent of design capacity, and actual output is 63 percent

QUESTION 2 10 points Save Answer In a job shop,

QUESTION 2 10 points Save Answer In a job shop, effective capacity is only 69 percent of design capacity, and actual output is 63 percent of effective output. What design capacity would be needed to achieve an actual output of 11 jobs per week? What is its effective capacity? a. The Design Capacity needed to achieve the required actual job outputs (round to whole number) b. The Effective Capacity needed to achieve the required actual job outputs = (round to whole number)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!