You are part of the Soshanguve housing project, as shown in Figure and your duties include quantity measurement, material ordering, and liaising with the resident engineer pertaining to daily progress. The house has a length of m and a breadth of m Determine the bank and loose condition of the soil if the trench to be excavated is mm wide
by mm deep and the bulking factor is
Calculate the volume of concrete needed to cast mm deep footing and mm slab. ignore brick wall width
Determine the number of bricks needed to build a mm wide foundational wall if the height is mm and bricks per square meter.